Trail_king_transporter_driver_operator_discussion1.jpg (50033 bytes)
Trail King S-300 Transporter with Midland Reactor Head arrives at DBNPS on 7-18-02!

The moment we were waiting for was upon us shortly after 12:15 PM. 
The special transporter, carrying the unused reactor head closure assembly
from Midland Michigan arrives in front of the DBNPS, utilizing Route 2.
The operator of the repositioning equipment, wearing a blue shirt, gets a briefing
from the transporter driver, just prior to walking back and climbing into his
platform, upon which was mounted the transporter control console unit.