Midland Head being swung over the Flatbed Truck in readiness for "final
delivery".
At this stage, the unused Midland Reactor Head is being
positioned by the 200 ton capacity
"Cherry Picker" crane as an operation necessary before lowering the head
atop the flatbed truck.