Trail King S-300 Transporter with Midland Reactor Head arrives at DBNPS on
7-18-02!
The moment we were waiting for was upon us shortly after
12:15 PM.
The special transporter, carrying the unused reactor head closure assembly
from Midland Michigan arrives in front of the DBNPS, utilizing Route 2.
The operator of the repositioning equipment, wearing a blue shirt, gets a briefing
from the transporter driver, just prior to walking back and climbing into his
platform, upon which was mounted the transporter control console unit.