The 200 ton capacity "Cherry Picker" about to lift the 100 ton
Midland Reactor Head!
The slings and lifting tripod are rigged to the pre-placed
lifting lugs on the Midland Head.
The slack is pulled out of the slings as shown above, then the "Delivery"
can begin!
Final Delivery (Transfer Process) picture sequence:
Lifting the Midland
Head from the transporter!
Swinging the Midland Head to position
above the flatbed truck!
Placing the Midland Head on the flatbed!